New Show En Francais Joëlle Rabu Bio News - Tour Updates Tonight...Piaf Discography Technical Information Media /Photo Gallery Links Page Contacts - Bookings
Joëlle Rabu

Technical Information

      Tonight...Piaf

Time of Our Lives



REQUIRED BY PRODUCTION

for

Tonight...Piaf



Accommodation
- 4 bedrooms (2 beds in each room)

Travel information
- Local map, restaurants open late
- Load-in area of venue

Venue
- Technical contact
- Stage drawings with dimensions
- In-house lighting equipment available
- In-house sound equipment available
- Type of Grand piano available, tuning date
- Risers: two levels each 16' long. Downstage level at 12" height and 6 ' depth; upstage level at 18" height, 4 ' depth minimum.
- Iron & ironing board
- 2 - 15 amp a/c circuits on stage for Bass Amp and 4 music lights
- 9 - dark, straight-backed, armless chairs (equivalents can be discussed)
- Water pitcher and 4 clear glasses

- Due to the time consuming nature of the technical set up, coffee, juice, water and a snack tray (i.e. cheese, vegetables, bread and crackers) would be greatly appreciated by the Artists and crew.



Technical Time Line

Staging and lighting hang & focus approx.4.5 hours

Sound check 1.5 hours

*set-up time depends on whether a lighting pre-hang can be arranged, number of crew and the amount of lighting instruments available

~Top~


REQUIRED BY PRODUCTION

for

Time of Our Lives



Accommodation
- 2 bedrooms (2 beds in each room)

Travel information
- Local map, restaurants open late
- Load-in area of venue

Venue
- Technical contact
- Stage drawings with dimensions
- In-house lighting equipment available
- In-house sound equipment available
- Type of Grand piano available, tuning date
- Iron & ironing board
- 2 - 15 amp a/c circuits on stage for Bass Amp and music lights.
- 2 Music stands with lights
- 1 black, straight-backed, armless chair
- 1 black stool
- 1 small round cabaret table
- Water pitcher and 2 glasses
- If no stage exists, a stage made of risers shall be constructed to the following minimum dimensions: 18" high by 32' wide by 16' deep.

- Due to the time consuming nature of the technical set up, coffee, juice, water and a snack tray (i.e. cheese, vegetables, bread and crackers) would be greatly appreciated by the Artists and crew.

Technical Time Line

Staging and lighting hang/focus approx 3 hours

Sound check 1.5 hours

*set-up time depends on whether a lighting pre-hang can be arranged, number of crew and the amount of lighting instruments available

~Top~




En Francais Biography Tonight...Piaf Discography
Tour News Media Links Bookings



Joëlle Rabu is represented by Caline Artists Management

Note: This site is best viewed with Microsoft Explorer 4.0 or higher, or Netscape Navigator 4.0 or higher.
This site also utilizes JavaScript technology. Best viewed with 800x600 pixel resolution or greater.

The contents, images and code on this web site are Copyright © by RME Productions & Technical Services. Use or distribution of copyright materials without the written authorization of RME Productions & Technical Services is prohibited. All other trademarks and servicemarks are the property of their respective owners.